From designing, engineering, and planning to boring, piping, and cabling installation, HardRock provides a comprehensive range of services that pave the way for safety and success in every project.
Horizontal directional drilling (HDD) allows HardRock to install underground pipes, conduits, and cables along a predetermined path without having to trench. Through this method, HardRock can install critical infrastructure in municipal and environmentally sensitive areas without demolishing existing structures or disturbing the environment. HardRock believes HDD is the best environmental solution for underground product installation.
HardRock's true turnkey services result in reduced downtime, delays, and/or calls regarding the customer's equipment.